A marine salvage or emergency tow begins with casualty assessment: position, people, pollution risk, stability, damage, weather and available connections. Responders then define authority, contract, resources and a risk-controlled plan. Mobilisation time cannot be promised until vessel availability, distance, permits and conditions are verified.
| Item | Definition | Planning relevance |
|---|---|---|
| Assess | Life, pollution, stability, position | Immediate priorities |
| Plan | Authority, contract, method, risk | Controlled response |
| Execute | Mobilise, connect, stabilise, tow | Safe handover |
What information is needed first?
Provide the position, vessel identity, people at risk, damage, flooding and pollution concerns. Describe weather, drift, propulsion availability and accessible connections. Early, accurate information helps responders assess priorities and determine the resources needed.
How is the response plan developed?
The response plan combines casualty condition, risks to people and the environment, available resources and authority requirements. Responsibilities and the proposed method must be clear. Emergency towing is one possible measure and should not be assumed appropriate for every casualty.
When can an emergency tug mobilise?
Timing depends on the nearest suitable tug, its readiness, transit distance, weather and permissions. A useful enquiry therefore includes the casualty position and immediate risks. Availability and an estimated arrival must be confirmed for the actual incident; no universal response time applies.