Project towage and heavy tow services for barge transportation and special cargo.

SOLACE MARITIME executes project towage and heavy tow operations, moving project cargo, heavy marine equipment and barge transportation with specialised marine operations expertise.

Project & Heavy Towage

  • Project cargo
  • Heavy marine equipment
  • Barge transportation
  • Special marine operations

Which operations does this service cover?

  • Barge and project-cargo towage
  • Heavy marine equipment relocation
  • Construction spread mobilisation
  • Special tow coordination

Who is this service for?

EPC contractors, heavy-lift teams, yards, fabricators and offshore construction companies.

Which vessels and technical capabilities are required?

The tug and towing spread are matched to resistance calculations, displacement, windage, draft, connection design, route, safe havens and marine warranty requirements.

How is the operation planned?

  1. 1.Initial scope and document review
  2. 2.Vessel and equipment suitability check
  3. 3.Route, port, weather and permit review
  4. 4.Method statement, risk assessment and contingency planning
  5. 5.Mobilisation, execution and operational reporting

How are safety and risk managed?

Every assignment is subject to a documented suitability and risk review. Weather limits, towline arrangements, communications, emergency actions, class or flag requirements and authority approvals are confirmed for the actual operation. Availability and response time are quoted only after these variables are checked.

How is the service area determined?

Coastal and international project routes are assessed individually; no regional coverage claim replaces route approval.

What information is needed for a quotation?

  • Service and intended operation
  • Vessel, tow or cargo particulars and drawings
  • Ports, coordinates, route and operating area
  • Required dates and expected duration
  • Required bollard pull, class, flag or equipment
  • Known permits, weather limits and special risks