A useful tug charter enquiry identifies the tow or assisted vessel, service type, ports or coordinates, dates, route, required bollard pull, towing equipment, class or flag constraints and commercial duration. Attach available drawings and approvals; uncertain requirements should be marked for engineering review.
| Item | Definition | Planning relevance |
|---|---|---|
| Technical | Tow data, pull, gear | Suitability review |
| Operational | Route, dates, weather limits | Mobilisation plan |
| Commercial | Charter form, duration, redelivery | Comparable quotation |
What should a charter enquiry include?
Include the service, tow particulars, locations, dates, expected duration and required equipment. Identify technical constraints and attach available drawings. Clear delivery and redelivery points help operators compare mobilisation requirements and provide quotations on a consistent basis.
Which certificates should be reviewed?
Request documents relevant to the intended service: class and statutory certificates, bollard pull evidence, equipment inspection records and insurance information. Review validity and any operating limitations. A document list should be tailored to the vessel, voyage and contracting requirements.
How is mobilisation planned?
Mobilisation planning combines the tug location, vessel readiness, transit time and required permissions. Confirm fuel, crew, equipment and the tow readiness date. The commercial agreement should make the work scope and mobilisation responsibilities clear before departure.